How Long Does It Take to Fit a Kitchen?

When planning a new kitchen, one of the first questions people ask is, “How long does it take to fit a kitchen?” The short answer? It depends. A straightforward kitchen installation can take about two to four weeks, but various factors influence the exact timeline. Let’s dive into the details, so you know what to expect.

kitchen flooring ideas marble
kitchen flooring ideas chevron wood

Factors That Affect How Long It Takes to Fit a Kitchen

1. Size of the Kitchen

The size of your kitchen plays a significant role in how long the installation will take. A small kitchen might be fitted in under two weeks, while a large, open-plan space could take up to a month. Why? More space means more cabinetry, worktops, and fittings to install.

2. Complexity of the Design

A simple layout with standard cabinets and worktops is quicker to complete. In contrast, a bespoke kitchen design with intricate details, such as integrated appliances, custom cabinetry, or curved worktops, will take longer. For example, templating and fitting heavy solid stone worktops like quartz or granite can add days to the timeline.

3. Type of Work Involved

The level of renovation impacts the schedule:

  • Full Kitchen Renovation: If you’re starting from scratch with new flooring, tiling, and electrical work, expect the project to take several weeks.
  • Kitchen Refresh: Replacing cabinet doors or updating worktops is much quicker—often done in just a few days.

4. Structural Changes

Making structural changes adds significant time to the job. For instance, removing walls to create an open-plan layout or rewiring to accommodate new appliances requires additional planning and execution. These steps can extend the timeline by a week or more.

5. Worktop Installation

Worktops deserve a special mention. Some materials, like laminate, can be fitted on-site in a day or two. Others, like granite or quartz, require templating and fabrication in a workshop, which adds a week or more to the schedule.

6. Unforeseen Issues

Snags can and do happen. Discovering substandard wiring, inadequate plumbing, or structural issues mid-installation can delay the project. An experienced carpenter will work efficiently to resolve these problems, but it’s wise to allow extra time for the unexpected.

kitchen flooring ideas wood thin planks

kitchen flooring ideas wood planks

The Step-by-Step Kitchen Fitting Timeline

1. Pre-Installation Preparations (1-2 Days)

Before fitting begins, your existing kitchen needs to be removed. This involves stripping out old cabinets, worktops, and appliances. Any essential prep work, such as rewiring or plumbing adjustments, starts during this phase.

2. Installing Cabinets and Units (3-5 Days)

The framework of your new kitchen takes shape with the installation of base and wall cabinets. Precision is key here to ensure everything is level and secure. Depending on the complexity of the design, this stage can take up to a week.

3. Fitting Worktops (2-10 Days)

As mentioned earlier, worktop installation can vary greatly. Laminate worktops are quick to fit, while solid stone materials require templating. Allow at least a week for fabrication and fitting if you’ve chosen granite or quartz.

4. Appliance Installation (1-2 Days)

Once the cabinets and worktops are in place, it’s time to install appliances. Moving appliances like ovens or dishwashers to new locations may require extra electrical or plumbing work, which can add a day or two.

5. Tiling and Flooring (3-5 Days)

Wondering how long it takes to tile a kitchen? Depending on the size of the area and the complexity of the pattern, tiling can take three to five days. Flooring, if part of the renovation, is typically installed after tiling to ensure a seamless finish.

6. Finishing Touches (1-2 Days)

The final step includes installing fixtures like handles, trims, and splashbacks, as well as addressing any snags. This is also when a professional fitter ensures everything is aligned and working as it should.

kitchen flooring ideas tiles

kitchen flooring ideas hexagon tiles

How to Minimise Delays

  • Plan Ahead: Order materials well in advance. Waiting for custom cabinetry or back ordered appliances can slow down the process.
  • Hire Professionals: Experienced kitchen carpenters like MJ Kloss Carpentry can spot potential issues early and keep the project on track.
  • Be Clear About Changes: Avoid last-minute changes to the design, as these can disrupt the timeline.

What Happens After the Installation?

After the kitchen is installed, it’s normal for kitchen fitters to return for a final inspection. They’ll fix any snags, like misaligned cabinet doors or silicone that needs resealing. This process typically takes an extra day or two.

Conclusion

So, how long does it take to fit a new kitchen? For most projects, you’re looking at two to four weeks, but the timeline varies based on factors like size, design complexity, and unforeseen issues. By hiring experienced professionals and planning carefully, you can ensure a smooth and efficient installation.

At MJ Kloss Carpentry, we combine craftsmanship and expertise to deliver stunning kitchens tailored to your needs. Ready to get started? Contact us today for a consultation